Power Plant
Projects
REFERENCE PROJECT |
Customer:
Jyväskylän Energia Oy, Finland
Project:
Jyväskylä Steam Turbine Plant jointly with Power Machines, Russia
Order:
2007
Take-Over:
2010
|
 |
Energico's
Services:
- Commercial and technical leadership functions of the Consortium
- Lay-out and piping engineering
- Basic engineering of turbine plant C&I-system
- Site management and coordination
- Erection of turbine, condenser, generator and turbine auxiliary systems and piping
- Commissioning management
Energico's Scope of Supplies:
- Lubrication oil coolers and cleaning system
- Thermal insulation of the steam turbine
- Electrical heaters for gland steam and lubrication oil
- Materials and prefabrication of steam turbine piping with thermal insulation
- Shut-off, safety and control valves for turbine auxiliary systems
- Cabling of turbine control, protection and monitoring systems
|
|
Main Data of the
Steam Turbine Plant: |
|
|
- Fuel |
Peat, biomass and coal |
- Live steam |
160 kg/s - 160 bar - 558 °C |
- Reheat steam |
142 kg/s - 39 bar - 558 °C |
- Cooling water flow rate |
5000 kg/s |
- Electrical output, |
max. 209 MW |
- District heat output |
200 MW |