Power Plant
Projects
REFERENCE PROJECT |
Customer:
Foster Wheeler Energia Oy, Finland
Project:
Refurbishment of Narva Power Plants
Eesti Block 8 Condensing Turbine Plant
Balti Block 11 Condensing and District Heating Turbine Plant
Order:
2001
Take-Over:
2004 - 2005
|
 |
|
Eesti Block 8 |
Energico's Services:
- Main Contractor functions for Turbine Plant refurbishment
- Basic engineering of turbine and auxiliary equipment
- Provision of equipment and parts for turbine plant refurbishment
- Site management
- Inspection of actual condition of turbine plant, residual life assessment
- Commissioning of Turbine Plant |
 |
|
Balti Block 11 |
Energico's Scope of Supplies (jointly with OJSC Power Machines (LMZ)):
- HP & IP Turbine Overhaul and Upratings
- LP Turbine Refurbishment and Upratings
- Refurbishment of Turbine Governing System
- Refurbishment of Turbine Protection System
- Turbine Monitoring System
- Modifications of Turbine for District Heating (Balti)
- Refurbishment of Turbine Oil System
- Implementation of turbine rotors jacking oil system
- Refurbishment of Gland Steam System
- Refurbishment of Condensing Plant
- Implementation of two-bypass start-up system (turbine start-up through intermediate pressure cylinder)
- miscellaneous modifications for improvement of turbine reliability |
Main Data of the
Steam Turbine Plants: |
|
|
Parameters:
|
Eesti Block 8
|
Balti Block 11 |
- live steam flow rate |
180 kg/s |
180 kg/s |
- live steam pressure |
127,4 bar(a)
|
127,4 bar(a) |
- live steam temperature |
535 °C |
535 °C |
- reheat steam flow rate
|
156,4 kg/s |
156,4 kg/s |
- reheat steam pressure |
24,5 bar |
24,5 bar |
- reheat steam temperature |
535 °C |
535 °C |
- cooling water flow rate |
6944 kg/s |
6944 kg/s |
- electrical output |
max. 215 MW |
max. 215 MW |
- process steam
|
N/A |
max. 87,5 MW |
- district heat output |
N/A |
120 MW |
|
|
|
Eesti Block 8 |
Balti Block 11 |
|
|
|
|
« Back |