REFERENCE PROJECT |
Customer:
Länsirannikon Voima Oy, Pori, Finland
Project:
Refurbishment of Low Pressure Turbine for Tahkoluoto Power
Plant
Order:
1994
Take-Over:
1995
|
 |
|
Refurbishment Work:
Delivery
of new Low
-Pressure rotor and internal casing for 240 MW condensing
turbine plant jointly with LMZ Energy Ltd
- Project coordination
-
Erection
- Commissioning and trial run |
|
|
Main Data of the Power Plant |
|
Fuel: |
Pulverised Coal (Heavy Oil)
|
Parameters: |
|
- live steam flow rate |
197,5 kg/s |
- live steam pressure |
180 bar |
- live steam temperature |
540 °C |
- reheat steam pressure |
24,5 bar (a) |
- reheat steam temperature |
540 °C |
- feed water temperature |
262 °C |
- cooling water flow rate |
6950 kg/s |
- Electrical output |
245 MW |